  1. 1. Governing Thermodynamics: Seal Face Heat Generation & Orifice Sizing
  2. Step 1: Face Frictional Heat Generation (Qfaces)
  3. Step 2: Required Flush Flow Rate (qflush)
  4. Step 3: Restrictive Orifice Sizing Formula (do)
  5. 2. Fully Reconciled Worked Sizing Problem: Boiler Feedwater Pump (Plan 11 vs Plan 23)
  6. Process Operating Conditions:
  7. Calculation Step 1: Required Flush Flow Rate (qflush)
  8. Calculation Step 2: Restrictive Orifice Sizing for Plan 11
  9. Calculation Step 3: Cooler Duty Comparison: Plan 11 vs. Plan 23
  10. 3. API 682 Piping Plan Selection Decision Matrix
  11. 4. Troubleshooting Guide: 5 Common Seal Flush Blunders
  12. Plant Engineering Procurement: Technical API 682 Data Checklist
  13. Frequently Asked Questions: API 682 Seal Flush Plans
  14. Sources and further reading
  15. More on Plant Maintenance and Reliability
Direct Engineering Answer: API 682 defines standardized piping flush plans designed to remove frictional seal face heat, prevent fluid vaporization, and provide zero-emission containment. Single seal flush plans use process fluid (Plan 11 discharge recirculation, Plan 23 internal pumping ring with cooler for hot water). Dual seal plans use an external buffer fluid (Plan 52 unpressurized for light hydrocarbons) or pressurized barrier fluid (Plan 53A/B/C maintained 1.4 bar above seal chamber pressure for toxic service).

In industrial process plants and refineries, mechanical seal failure accounts for more than 70% of all centrifugal pump downtime. The primary cause of premature seal failure is not mechanical component wear, but the breakdown of the microscopic liquid lubricating film between the rotating and stationary seal faces. Rotating at peripheral speeds up to 25 meters per second under high chamber pressure, seal faces generate substantial frictional heat (typically 1.5 to 5.0 kW). Without continuous, engineered flushing, the fluid film flashes into vapor, leading to dry running, acoustic squealing, thermal heat checking, and catastrophic seal failure within minutes.

The American Petroleum Institute API 682 standard (ISO 21049) establishes the definitive global benchmark for mechanical seal flush piping systems. Sizing and selecting the proper flush plan forms the third pillar of reliable pump engineering, building upon our industrial process pumps selection guide, accurate total dynamic head calculation, verification of suction margin in our NPSHa calculation formula guide, and equipment classification in our API 610 pump types guide. When process fluids carry abrasive catalytic fines or suspended solids, integrating upstream solid separation via hydrocyclone filters and technology (or specifying API Plan 31) protects seal faces from rapid abrasive scouring.

This comprehensive engineering guide examines the governing thermodynamics of seal face heat generation, provides exact sizing equations for flush flow rates and restrictive orifices, contrasts Plan 11 against Plan 23 in hot services, details dual seal barrier systems (Plan 52 vs Plan 53A/B/C), and presents an actionable engineering decision matrix.

API 682 CARTRIDGE MECHANICAL SEAL CHAMBER ANATOMY Arrangement 1 (Single) & Arrangement 2/3 (Dual) Flush Port Geometry

Pump Drive Shaft (2950 RPM)

Heavy-Duty API 682 Cartridge Gland Plate

Flush Port (F) Plan 11 / 23 In

1 µm Film (Heat Source)

Springs

Barrier / Buffer Chamber Plan 52 (Unpressurized) Plan 53A/B/C (Pressurized)

Internal Pumping Ring

Barrier Out (LBO)

Essential Design Law: Flush flow rate must remove 100% of face frictional heat plus casing heat soak, keeping seal chamber temperature at least 20°C below fluid atmospheric boiling point.

Figure 1: Cross-sectional schematic of an API 682 cartridge mechanical seal showing the primary sealing faces, 1-micron fluid film heat zone, flush ports, and dual-seal barrier chamber with integral pumping ring.

THE 4 CORE API 682 MECHANICAL SEAL PIPING SCHEMATICS

PLAN 11 Discharge Recirculation

Pump Orifice Seal

General Clean Duty Default single-seal plan Discharge to seal chamber Continuous energy loss T < 80°C Clean Fluids

PLAN 23 Pumping Ring & Cooler

Seal Cooler

Hot Water & Boiler Feed Recirculates chamber fluid Cools only seal soak heat 80% smaller cooler needed T > 80°C to 260°C Feedwater

PLAN 52 Unpressurized Dual Seal

Dual Tank To Flare

Volatile Hydrocarbons Buffer fluid pressure < chamber Zero atmospheric emissions Process leaks into buffer Propane, Butane, Condensate

PLAN 53B Pressurized Bladder

Dual Bladder

Toxic / Carcinogenic Barrier pressure > chamber (+1.4 bar) Pre-charged N₂ bladder Zero process leakage H₂S, Benzene, Lethal Fluids

Figure 2: Hydraulic circuit comparison of the 4 most prevalent API 682 piping plans: Plan 11 (clean single seal), Plan 23 (hot feedwater seal cooler loop), Plan 52 (unpressurized dual hydrocarbon buffer), and Plan 53B (pressurized nitrogen bladder barrier loop).

1. Governing Thermodynamics: Seal Face Heat Generation & Orifice Sizing

The mechanical work dissipated at the mechanical seal face consists of frictional rubbing heat plus fluid viscous drag (turbulence heat):

Qtotal = Qfaces + Qturbulence

Step 1: Face Frictional Heat Generation (Qfaces)

Qfaces = 2π · fm · Pface · rm² · omega · b

Where fm is the face coefficient of friction (0.05 → 0.08 for Carbon vs SiC; 0.08 → 0.12 for SiC vs SiC), Pface is net hydraulic face closing pressure in Pascals, rm is mean face radius in meters, omega is rotational angular velocity in radians per second (omega = 2π N / 60), and b is face contact width in meters.

Step 2: Required Flush Flow Rate (qflush)

To prevent fluid vaporization, the temperature rise ($Delta T$) across the seal chamber must be limited to 5circC to 15circC (10circC typical per API 682):

qflush = Qtotalρ · Cp · Δ T

Where $
ho$ is fluid density in kg/m³, Cp is fluid specific heat capacity in J/(kg·circC), and qflush is flow rate in m³/s.

Step 3: Restrictive Orifice Sizing Formula (do)

In Plan 11 systems, pressure drops from pump discharge (Pd) down to seal chamber pressure (Pchamber). The orifice diameter (do) is sized via the standard hydraulic orifice equation:

do = √( 4 · qflushπ · Cd · √(2 · (Pd – Pchamber)ρ) )

Where Cd is the discharge coefficient (0.62 for square-edged sharp orifices), and (Pd – Pchamber) is the differential pressure in Pascals.

2. Fully Reconciled Worked Sizing Problem: Boiler Feedwater Pump (Plan 11 vs Plan 23)

To demonstrate the thermodynamic superiority of Plan 23 over Plan 11 in high-temperature applications, we evaluate a high-pressure boiler feedwater pump.

Process Operating Conditions:

For this illustrative plant scenario, assume the following verified operating parameters:

  • Operating Fluid: Deaerated boiler feedwater at 160circC (320circF)
  • Operating Fluid Density ($
    ho$):
    907.3 kg/m³ at 160circC
  • Specific Heat Capacity (Cp): 4340 J/(kg·circC)
  • Pump Discharge Pressure (Pd): 32.0 bar(g) = 3,200,000 Pa
  • Seal Chamber Pressure (Pchamber): 8.0 bar(g) = 800,000 Pa
  • Shaft Rotational Speed (N): 2950 RPM (omega = 308.9 rad/s)
  • Shaft Sleeve Diameter: 65 mm (Dshaft = 0.065 m)
  • Seal Face Materials: Silicon Carbide vs Premium Carbon (fm = 0.07)
  • Calculated Face Heat Generation (Qtotal): 2.85 kW = 2850 W
  • Allowable Temperature Rise ($Delta T$): 10.0circC across seal faces

Calculation Step 1: Required Flush Flow Rate (qflush)

qflush = 2850 W907.3 kg/m³ × 4340 J/(kg·circC) × 10.0circC = 285039,376,820 = 0.00007238 m³/s = 4.34 L/min quad (1.15 gpm)

Practical Takeaway: A minimum flush flow rate of 4.34 L/min is required to remove 2.85 kW of heat while keeping face temperature rise under 10°C, ensuring the water film does not flash into steam.

Calculation Step 2: Restrictive Orifice Sizing for Plan 11

Differential pressure across the Plan 11 orifice: Δ P = 32.0 – 8.0 = 24.0 bar = 2,400,000 Pa.

vorifice = Cd · √(2 Δ Pρ) = 0.62 · √(2 × 2,400,000907.3) = 0.62 · √(5290.4) = 0.62 × 72.73 = 45.09 m/s

Aorifice = qflushvorifice = 0.0000723845.09 = 1.605 × 10-6 m² implies do = √(4 × 1.605 × 10-6pi) = 0.00143 m = mathbf{1.43 mm}

Critical API 682 Constraint: API 682 Clause 6.1.2.8 strictly mandates that restrictive flush orifices must not be smaller than **3.0 mm (0.125 in)** to prevent clogging from pipe scale and particulate. Installing a compliant 3.0 mm orifice increases the flush flow rate to:

qactual = 45.09 × pi4(0.003)² = 0.0003187 m³/s = mathbf{19.12 L/min} quad (5.05 gpm)

Calculation Step 3: Cooler Duty Comparison: Plan 11 vs. Plan 23

If Plan 11 were cooled with an in-line heat exchanger (Plan 21) to protect the seal from 160circC water, cooling 19.12 L/min of continuous discharge water down to 70circC (Δ T = 90circC) requires:

Qcooler,Plan 21 = ρ · qactual · Cp · Δ T = 907.3 × 0.0003187 × 4340 × 90.0 = mathbf{113.0 kW of thermal cooling!}

In stark contrast, **API Plan 23** uses a throat bushing to isolate the seal chamber from the hot pump casing. The internal pumping ring recirculates only the chamber fluid through a dedicated seal cooler:

Qcooler,Plan 23 = Qtotal + Qsoak = 2.85 kW + 1.20 kW = mathbf{4.05 kW of thermal cooling!}

Mechanical Seal Piping Configuration Flush Flow Source Required Cooler Thermal Rating Plant Energy & Cooling Water Penalty
Plan 11 with In-Line Cooler (Plan 21) Continuous discharge bypass 113.0 kW (385,600 BTU/hr) Severe energy waste; large shell-and-tube cooler required
Plan 23 with Internal Pumping Ring Chamber closed-loop recirculation 4.05 kW (13,800 BTU/hr) 96.4% reduction in cooling water load! Compact finned cooler
API 682 THERMAL DUTY & UTILITY SAVINGS COMPARISON (160°C BOILER FEEDWATER) Heat Dissipation Duty (kW) and Cooling Water Consumption Comparison Between Flush Plan 11 and Plan 23

PLAN 11 (DISCHARGE BYPASS FLUSH)

Process Flush Temperature: 160.0 °C (Uncooled Process)

Continuous Flush Flow Rate: 2.50 m³/h (41.7 L/min)

Total Thermal Cooling Load: 113.00 kW

113.0 kW Thermal Demand (100%)

Required Cooling Water (ΔT=5°C): 19.43 m³/h (85.6 GPM)

Seal Chamber Fluid State: High Vapor Pressure / Risk of Flashing

Massive continuous energy waste on high-temp duty

PLAN 23 (CLOSED-LOOP RECIRCULATION)

Isolated Chamber Temperature: 75.0 °C (Controlled by Cooler)

Internal Pumping Ring Circulation: 0.80 m³/h (13.3 L/min)

Total Thermal Cooling Load: 4.05 kW

4.05 kW (3.6%)

Required Cooling Water (ΔT=5°C): 0.70 m³/h (3.1 GPM)

Seal Chamber Fluid State: >40°C Vapor Pressure Margin / Stable Film

96.4% Thermal Duty Reduction (Saves 108.95 kW!)

KEY SELECTION TAKEAWAY FOR ROTATING EQUIPMENT ENGINEERS For hot water service (>80°C) and hydrocarbon boiler feed, Plan 23 eliminates product thermal shock, extends MTBF by 300%, and cuts utility cooling demand by 96.4%.

Figure 3: Thermal duty and utility cooling water consumption comparison between API 682 Plan 11 and Plan 23 on a 160°C boiler feedwater application.

Practical Takeaway: For boiler feedwater, condensate, and hot hydrocarbon services exceeding 80°C, Plan 23 reduces seal cooler thermal duty from 113 kW to 4 kW, preventing cooling water scaling while delivering extended mechanical seal life.

3. API 682 Piping Plan Selection Decision Matrix

API Plan Arrangement Flush Fluid Source Thermal Limit Target Process Services
Plan 11 Single (Arr. 1) Discharge bypass through orifice < 80°C Clean cool water, non-polymerizing chemicals, diesel transfer
Plan 23 Single (Arr. 1) Internal pumping ring through cooler Up to 260°C Boiler feedwater, hot condensates, clean hydrocarbons > 80°C
Plan 31 Single (Arr. 1) Discharge via hydrocyclone separator < 100°C Liquids with inorganic solids/grit (SG solids > 2x SG liquid)
Plan 32 Single (Arr. 1) External clean flushing source Variable Abrasive slurries, polymerizing resins, paper pulp liquors
Plan 52 Dual Unpressurized (Arr. 2) Atmospheric buffer tank with cooling coils < 150°C Light hydrocarbons, LPG, propane, butane (zero emissions)
Plan 53A Dual Pressurized (Arr. 3) Nitrogen-pressurized barrier vessel < 150°C Toxic, flammable, carcinogenic fluids (pressure > chamber + 1.4 bar)
Plan 53B Dual Pressurized (Arr. 3) Bladder accumulator with N₂ charge Up to 260°C Remote sites, offshore platforms, no continuous N₂ supply required
Plan 54 Dual Pressurized (Arr. 3) External centralized lube/barrier console High pressure Multiple high-power pumps, refinery hydrotreater units

4. Troubleshooting Guide: 5 Common Seal Flush Blunders

Operational Blunder Physical Failure Mechanism Seal Failure Impact Corrected Engineering Procedure
Sub-3mm Orifice in Plan 11 Pipe scale or weld slag plugs small 1.5mm orifice opening Flush flow stops instantly; seal faces overheat and shatter within 2 minutes Enforce API 682 minimum 3.0mm orifice size; install dual parallel orifices if needed
Air Binding in Plan 23 Cooler High point vapor pocket traps air in cooler tubing without top vent Pumping ring loses prime; circulation stops; seal boils and faces blister Ensure piping slopes upward (minimum 1:20); install high-point manual vent valve
Barrier Pressure Loss in Plan 53A Nitrogen supply regulator drops below pump seal chamber pressure Process fluid forces across inner seal into barrier, contaminating reservoir Install low-pressure switch interlocked with plant DCS to trip pump on N₂ drop
Reverse Pumping Ring Rotation Pump motor wired backwards during electrical commissioning Pumping ring opposes flow, choking circulation through seal cooler Verify motor rotation before coupling; check flow arrow on bi-directional pumping rings
Using Plan 31 on Organic Fines Slurry solids have specific gravity close to liquid (SG_solid ~ SG_liquid) Hydrocyclone cannot achieve centrifugal separation; abrasive fines enter flush port Specify Plan 32 external flush or Plan 53B dual seal for low density solids

Plant Engineering Procurement: Technical API 682 Data Checklist

When issuing technical procurement datasheets to mechanical seal OEMs (such as John Crane, EagleBurgmann, or Flowserve), include the following complete data:

  • Seal Category & Arrangement: API 682 Category 1, 2, or 3; Arrangement 1 (single), Arrangement 2 (dual unpressurized), or Arrangement 3 (dual pressurized).
  • Selected Piping Plan: Plan 11, Plan 23, Plan 52, or Plan 53B with certified instrument datasheet.
  • Seal Chamber Pressure & Temperature: Maximum dynamic working pressure, operating temperature, and vapor pressure at maximum temperature.
  • Face Metallurgy & Balance Ratio: Self-sintered Silicon Carbide vs Resin-impregnated Carbon, balance ratio 0.70 to 0.75, with Hastelloy C-276 springs.
  • Cooler Thermal Sizing Sheet: Vendor calculation confirming cooler heat removal capacity and required cooling water flow rate at 35°C cooling water inlet.

Free tools for this topic: OEE calculator · Motor running cost calculator · all free engineering tools

Frequently Asked Questions: API 682 Seal Flush Plans

Why is Plan 23 preferred over Plan 11 for hot boiler feedwater?
Plan 11 continuously takes hot fluid from the pump discharge, passes it across the seal faces, and returns it to the pump casing. If cooled with a heat exchanger (Plan 21), it requires cooling the entire continuous flush stream (often 100 kW+ of energy). Plan 23 uses a throat bushing to isolate the seal chamber and an internal pumping ring to recirculate only the chamber fluid through a cooler, removing only seal friction and heat soak (typically 3 to 5 kW), cutting cooling water demand by over 90%.

What is the functional difference between Plan 52 and Plan 53?
Plan 52 is an unpressurized dual seal system where buffer fluid pressure is maintained below pump seal chamber pressure (vented to a low-pressure flare header). Any inner seal leakage travels into the buffer fluid. Plan 53 is a pressurized dual seal system where barrier fluid is maintained at least 1.4 bar above seal chamber pressure. Any leakage across the inner seal is clean barrier fluid into the process, guaranteeing zero fugitive process emissions.

What causes a Plan 11 flush orifice to fail?
The most common failure is particulate plugging when the orifice diameter is smaller than the API 682 minimum of 3.0 mm (0.125 in). The second common failure is severe cavitation erosion and wire-drawing across the orifice plate when taking large pressure drops (e.g. dropping 40 bar to 5 bar across a single stage), which erodes the orifice hole and dramatically increases flush flow rate.


Sources and further reading

For standards, data and independent guidance on this topic, see Hydraulic Institute (pump standards and user guidance), US Department of Energy pump systems resources (pump efficiency guidance), American Petroleum Institute (pump and seal standards) and The Engineering ToolBox (engineering reference data and calculators). Always check the current edition and your site conditions before applying any figure.

Free tool for this topic

OEE Calculator (Overall Equipment Effectiveness)Availability, performance, quality and overall equipment effectiveness from planned time, downtime, cycle time and output.
Open calculator

Continue learning

More on Plant Maintenance and Reliability

View all →
Sponsored
Jignesh S Panchal
Technical Editorial Author Verified Editor

Jignesh S Panchal

Founder — Jaadu Digital & Musafir Infotech · 9+ Years in Industrial B2B

Jignesh S Panchal is the founder of Jaadu Digital and Musafir Infotech, and the publisher behind EngiTech. With over 9 years of hands-on experience in industrial marketing and B2B growth, he works closely with machinery OEMs, process equipment manufacturers, and industrial service providers across thermal processing, fluid handling, automation, packaging, and plant reliability. Combining deep practical knowledge of industrial manufacturing with how technical buyers actually evaluate equipment, he built EngiTech to give plant engineers and procurement teams reliable sizing tools, fault diagnostics, and verified B2B supplier discovery.

Your saved guides

Saved only in this browser. No account required.

Advertisement