Size a three-phase distribution transformer in kVA from plant load, demand factor, power factor and growth margin, plus HV/LV currents and secondary 3-phase short-circuit current Isc.
Results
- Required transformer rating
- Primary full-load current (HV)
- A
- Secondary full-load current (LV)
- A
- Secondary 3-phase fault current (Isc)
Results are engineering estimates for preliminary design. Verify critical values with codes, vendor data or a qualified engineer.
Formula used
Required kVA = (kW × Demand ÷ cos φ) × (1 + Margin). Full-load current I = kVA × 1000 ÷ (√3 × V).
Bolted 3-phase secondary fault current (infinite primary bus): Isc = ILV ÷ (%Z / 100).
How to use this calculator
- Enter total connected kW, expected demand factor and average power factor.
- Add spare capacity margin (typically 20–25 %) and pick the next standard kVA frame (e.g. 500, 750, 1000, 1600 kVA).
- Enter HV/LV voltages and %Z to check LV breaker interrupting kA rating.
Worked example
A 600 kW plant (80 % demand, 0.85 PF, 25 % margin) requires 705.9 kVA (select a standard 750 or 1000 kVA 11 kV / 415 V unit). LV FLA = 982 A; at 5 % impedance, Isc = 19.64 kA.
Frequently asked questions
How does %Z affect transformer short-circuit current?
Lower %Z reduces voltage regulation dip during motor starting, but raises secondary bolted fault current (Isc = I_FLA / %Z), requiring higher-kA MCCB/ACB switchgear.
What load percentage gives maximum transformer efficiency?
Most distribution transformers achieve peak efficiency around 50–70 % of rated kVA, where no-load core losses equal load-dependent copper (I²R) losses.
Should harmonic loads (VFDs, rectifiers) derate a transformer?
Yes. Non-linear VFD and UPS loads add eddy-current heating; specify a K-factor (K-4 or K-13) transformer or derate a standard unit by 15–25 %.