Transformer kVA Sizing & Fault Current Calculator

No sign-up · calculates in your browser

Size a three-phase distribution transformer in kVA from plant load, demand factor, power factor and growth margin, plus HV/LV currents and secondary 3-phase short-circuit current Isc.

Free engineering tool Formula, worked example and FAQs below · results update as you type
%
cos φ
%
%

Results

Required transformer rating
—
Primary full-load current (HV)
— A
Secondary full-load current (LV)
— A
Secondary 3-phase fault current (Isc)
—

Results are engineering estimates for preliminary design. Verify critical values with codes, vendor data or a qualified engineer.

Advertisement

Formula used

Required kVA = (kW × Demand ÷ cos φ) × (1 + Margin). Full-load current I = kVA × 1000 ÷ (√3 × V).

Bolted 3-phase secondary fault current (infinite primary bus): Isc = ILV ÷ (%Z / 100).

How to use this calculator

  1. Enter total connected kW, expected demand factor and average power factor.
  2. Add spare capacity margin (typically 20–25 %) and pick the next standard kVA frame (e.g. 500, 750, 1000, 1600 kVA).
  3. Enter HV/LV voltages and %Z to check LV breaker interrupting kA rating.

Worked example

A 600 kW plant (80 % demand, 0.85 PF, 25 % margin) requires 705.9 kVA (select a standard 750 or 1000 kVA 11 kV / 415 V unit). LV FLA = 982 A; at 5 % impedance, Isc = 19.64 kA.

Frequently asked questions

How does %Z affect transformer short-circuit current?

Lower %Z reduces voltage regulation dip during motor starting, but raises secondary bolted fault current (Isc = I_FLA / %Z), requiring higher-kA MCCB/ACB switchgear.

What load percentage gives maximum transformer efficiency?

Most distribution transformers achieve peak efficiency around 50–70 % of rated kVA, where no-load core losses equal load-dependent copper (I²R) losses.

Should harmonic loads (VFDs, rectifiers) derate a transformer?

Yes. Non-linear VFD and UPS loads add eddy-current heating; specify a K-factor (K-4 or K-13) transformer or derate a standard unit by 15–25 %.